Refurbishment

This is the work you fit into the window that exists: between two seasons, between two tenants, between the last night and the reopening. The structure is not touched — the clock is what rules.

Bringing a place back up without touching the structure: paint, floors, joinery, isolated plumbing. It is the work that fits in a short window between two uses.

5

The stages, in order

What decides the price

Area and access. Painting three hundred square metres on a fifth floor with no lift is not the same job as three hundred at street level.

What eats the schedule

The window you get. An empty house is worked all day; an open hotel is worked when the rooms are free.

The stages, in order

  1. 01

    Preparation and protection

    Cover what stays, remove what goes. In an occupied house or a hotel between seasons, this is what separates a refurbishment from a mess.

  2. 02

    Surface work

    Filling cracks, dealing with visible damp, sanding. This is the stage that decides whether the paint lasts three years or three months.

  3. 03

    Paint and floors

    What changes the face of the place. It goes in this order because paint over a new floor is the most expensive way to paint.

  4. 04

    Joinery and metalwork

    Doors, skirtings, cupboards, railings. They come at the end so they do not collect paint or sanding dust.

  5. 05

    Cleaning and reopening

    The space has to be ready to use on the day, not ready to clean.

What we ask before giving a price

  • Between which dates is the space free to be worked on?
  • Will it be in use during the work, or completely empty?
  • Are there hours when no noise is allowed?
  • How many square metres, on which floor, and with what access?

The mistakes that cost money

  • Painting over the problem

    Damp covered with paint comes back in the first wet season, and it brings the whole paint job with it.

  • Ordering materials at the last minute

    In a two-week window, a floor with a three-week lead time is the end of the calendar — and no amount of people fixes that.

  • Booking the reopening for cleaning day

    A finished space is not a ready space. A day has to fit between the last coat and the first visitor.

What it includes

  • Interior and exterior painting
  • Floors and wall finishes
  • Joinery and metalwork

Which of the three is your job?

If you do not know, that works too: the site visit is exactly for that, and it is what separates a price from a guess.