Restaurants and retail · The date that rules

The opening

The job is built backwards: from opening day and back. Every day behind a closed door is revenue that never comes back.

The calendar, counting backwards

The opening

  1. 05

    The landlord's consent

    Before anything. A lease that does not allow the work the business needs is a problem to settle before there is a quote.

  2. 04

    Services

    Extraction, gas, water, electrics and air conditioning. They decide the schedule of a commercial space, and they are what almost everybody leaves until after the finishes.

  3. 03

    Equipment and installation

    The kitchen, the counter, the refrigeration. It arrives once the services are in — not before, or it stands in the way of the work.

  4. 02

    Inspections and licensing

    A finished space without an inspection does not open. It does not depend on whoever does the work, and it is the stage most often left to the end.

  5. 01

    Opening day

    The date already given to suppliers, to staff and often to the public. Everything counts back from it.

What is at stake

Every day behind a closed door is revenue that never comes back.

How the job is organised

The fit-out is planned backwards from the opening date, and that date is what sets the order of the work.

Request a quote

What we ask before giving a price

  • What is the opening date, and has it been announced to anyone?
  • Does the space have a licence compatible with the activity?
  • What services are needed — extraction, gas, refrigeration, air conditioning?
  • Does the lease allow the work, and who pays for what at the end?

What usually goes wrong in this kind of job

  • Leaving extraction to the end

    In a kitchen it is the service that rules everything else: it runs where it has to run, and the ceiling and the layout organise themselves around it.

  • Taking delivery of equipment too early

    A counter still boxed in the middle of a building site takes up space, collects dust and slows down whoever is working there.

  • Booking the opening with no room for inspection

    Between the finished work and the open door there are licences that depend on nobody standing on the site.

The opening?

The fit-out is planned backwards from the opening date, and that date is what sets the order of the work.